KY 536 from KY 1303 to Williamswoods Dr.
WHAT
is the scope of the project?
Mt. Zion Rd. (KY 536) is being widened from two to four lanes between Bristow Rd. (KY 1303) and Williamswoods Dr.
Two roundabouts will be built:
-
At the intersection of KY 536 and KY 1303
-
At the intersection of KY 536 and Hogrefe Road
A multi-use path will be built on both sides of Mt. Zion Rd. along the entire length of the project.
An overpass bridge over a nearby railroad will be widened.
Curb and gutter improvements, as well as storm sewer and drainage work will be completed as part of the project.
WHY
are these improvements
taking place?
Widening the road in the project area from two lanes to four will reduce congestion and improve traffic efficiency. The multi-use paths on each side of KY 536 will improve bicycle and pedestrian connectivity and safety. The two roundabouts will improve traffic flow, reduce congestion and increase safety.
WHEN
will work begin and end?
Project construction began April 22, 2024, with completion expected in Spring 2027.
WHERE
will there be impacts to traffic because of the project work?
Crews will be working on KY 536 between KY 1303 and Williamswoods Drive.
​
Check our Travel Advisories page for more information.
​
Please slow down and use caution as you travel through this active work zone.
HOW
much will the project cost?
The project cost is approximately $31 million.
WHO
can I contact if I have questions or comments?
We would love to hear from you. Please e-mail us at [email protected] with questions, comments, or input on our work.
Contractors may reference Item No. 24-1305.